Controllers Mechatronics Markets Product Development EMS Company News Downloads Stock Contact  
Home > Product Development > Verification Testing

Verification & Testing

 
 

New automation concepts require controllers to remain active under all circumstances. Controllers in hospitals, on oil rigs or at any far corner of the world can simply never fail. Our engineers are used to designing industrial electronics that remain functional under heavy circumstances, 24/7 and for many decades in a row. Based on many years of experience we are able to provide solutions for several industries. And thanks to a global network of clients, we also have a world of experience with various standards (CE, UL-CSA, etc.) We can therefore easily state that creating designs to accomplish ‘zero service’ quality levels is in our genes. We consider all specific requirements of the product from the draft of the design. Our internal testing facilities (EMC pre-compliance, temperature, humidity and vibrations) considerably reduce development througput time and also enable us to offer excellent service during your product’s entire life cycle.

 

Our test facilities include the following components:

EMC pre-compliance

Temperature and humidity testing

- IEC 60068-2-1: Cold test

- IEC 60068-2-2: Dry heat test

- IEC 60068-2-14: Test Nb:

gradual change of temperature test

- IEC 60068-2-30: Damp heat, cyclic (12 + 12h cycle)

- IEC 60068-2-78: Damp heat, steady state

Vibration tests

- IEC 60068-2-6: Sine vibration

- IEC 60068-2-27: Shock

- IEC 60068-2-64: Random vibration

Salt Mist tests

- IEC 60068-2-11: Salt spray